The first multifamily building constructed from precast ECA concrete components in Poland was built in
Częstochowa in 2016. Buszrem was a manufacturer of the prefabricated components, a developer and a
contractor of the building. The construction is a perfect example of the advantages of prefabrication.
Our production plant offers a high degree of precision that is not possible to be achieved by bricklaying the walls from the small-sized components or pouring floors on the site. All technological holes with installations in the walls and floors are created on the spot. Because the surface of the components is smooth, the finishing works can be started immediately (the walls do not require plastering). The precise system allows of combining all components of the structure and installing them directly from the vehicle – with no need for unloading and storage. The season of the year does not affect the construction works because no stage of work needs seasoning or service interruption. A building in move-in condition can be constructed for a few months. A developer has complete confidence that the building operation starts according to the schedule..